A. Demand Planning (DP)
1. Forecast is not generating for a new product even though history exists. What checks do you perform in planning book, MAPE settings, characteristic combinations & proportional factors?
2. Customer wants to copy history from an old product to a new one but exclude pandemic-year sales. How will you configure macro logic or realignment rules?
3. A planner updated forecast in planning book but it’s not appearing in SNP. How do you troubleshoot DP → SNP release, version management & background jobs?
4. Seasonal forecasting model is giving inconsistent results. How would you analyze forecast profile, alpha-beta-gamma settings & outlier correction?
🔵 B. Supply Network Planning (SNP)
5. Deployment heuristic generates no stock transfers. What areas will you check in transport lanes, quota arrangements & SNP planning run?
6. Supply is getting allocated only to one location despite defined quotas. How will you troubleshoot quota % values, validity dates & fair-share logic?
7. Optimizer is not respecting minimum lot size and rounding values. What checks do you perform in cost profile, penalty factors & master data?
8. SNP Heuristics plan shows overloaded resource capacity. How do you analyze resource master, production data structure & capacity bucket profile?
9. Planned orders for external procurement are created without considering vendor calendars. Where do you check calendar integration & transportation lanes?
🔵 C. PP/DS (Production Planning & Detailed Scheduling)
10. PPDS is not creating planned orders after a demand change in ECC. How do you analyze CIF queues, integration models & heuristics?
11. Orders are created but not scheduled on the preferred resource. What checks do you perform on mode linking, PDS setup & strategy profile?
12. Finite scheduling is not reducing bottlenecks. How would you examine PEGID logic, setup matrix & scheduling strategy?
13. Customer wants to sequence production based on color groups. How do you configure setup matrix + sequence-dependent setup times?
14. Planned orders are generated inside non-working hours. How do you check resource calendars, shift patterns & PPDS settings?
🔵 D. GATP (Global ATP)
15. A sales order in ECC is confirmed at a future date but stock exists. How do you debug ATP rules, product allocation & check instructions?
16. Product allocation (PAL) is not restricting orders for a key customer. What checks do you perform in allocation groups, time series & category combinations?
17. Backorder processing (BOP) is not reassigning quantities based on priority. What steps do you check in BOP variants, segmentation & rule determination?
🔵 E. CIF (Core Interface Integration)
18. Material master changes in ECC are not reflecting in APO. How do you review CIF queues, inconsistent data & integration models?
19. A PDS is not transferring correctly to APO. What would you inspect in PPM/PDS generation, BOM routing & CIF logs?
20. New location is available in ECC but missing in APO. How do you activate integration models + fix master data inconsistencies?
🔵 F. Deployment & TLB (Transport Load Builder)
21. Deployment ignored safety stock at the receiving location. Where do you verify deployment strategy, stock transfer priorities & demand recognition?
22. TLB is not creating shipments though deployment planned receipts exist. What do you check in TLB profiles, minimum constraint & transportation lanes?
23. Substitution is not happening between DCs during shortage. How do you validate substitution rules, location products & deployment heuristics?
🔵 G. Monitoring & Alerts
24. The planner alerts dashboard shows no alerts after planning run. How do you check alert profile assignment, selection profiles & background jobs?
25. APO liveCache inconsistencies impact planning results. How will you analyze and correct consistency checks, CCR transactions & LC deletion/rebuild?